HONDA CBR

racermike39's picture

BIG GIANT EV GRIN :>)...CBR 600 F3 CONVERSION RUNS AND DRIVES!

Today was a great day. A big victory in my little EV world. I rode the CBR to my friends house. He just about flipped out. "Dude! Your NUTS! That thing is cool! You totally snuk up on me!" ( he was working in the yard when I silently drove up). :)
My 14 year old niece came over for the day to visit, and I gave her the very first ride as a passenger on the bike. Pretty neat. Then she drove every other EV we have, taking turns on each one all day long. It was a great EV day, and all 5 EV's were running great.
ELECTRIC_FLEET1.jpg
Just for the fun ot it, we added up the total voltage for all 5 EVs. It adds up to 228 Volts. I guess what separates the men from the boys though is Amps right? ;)
Also, Friday night we took the Elec-Trak electric tractor to the local fair, and pulled it in the garden tractor pull.
What a blast that was. The announcer had a lot of fun with it. He would tell everyone in the crowd, "now everyone be quiet and listen to this motor run". My wife said the whole place went silent! The tractor pulled 93 feet, and the longest pull by a well tuned ICE tractor was 107 feet. Out of 15 tractors in the class, the Elec-Trac finished about 10th, with only about 5 feet in distance separating the rest of the field. The people really enjoyed watching it pull, and I was approched by several that had never seen one, or remembered them years ago. I went home with another big giant EV grin.
Thanks again to all who posted such great and useful information, and taking the time to explain things in laymans terms, separating fact from fiction, and good product recommendations.
I hope to provide some video and speed/range data as soon as the CBR is registered for the road.

racermike39's picture

HONDA CBR 600 F3 CONVERSION.....A LITTLE MORE PROGRESS

Well it's been about 3 weeks, and I haven't touched the bike for about 2 of the three. I finally had to stop neglecting all the other things I should be doing, so the bike has been back burnered for a while. I have completed the fabrication of the battery rack. Final welding still needs to be done.
batt_rack-mt.jpg
batt_rack_front.jpg
I have located most of the components and completed the preliminary wiring. I still need to wire the battery charging circuit and the PakTracr needs to be wired.
comp_loc.jpg
If you look close, you can see the fuse holder, contactor and controller. I have left the option open to run the 7th battery under the tank. This will be a plug and play additional battery. Two connectors will plug in to the main battery string and charging circuit. For now, the 7th battery will not be tied into the Pak Trakr.
The DC-DC converter is in the factory battery location, under this aluminum plate
DC_DC.jpg
Here is the throttle and the other side otf the 7th battery.
throttle.jpg
All this stuff still fits inside the bodywork pretty well.
right_bw.jpg
Next I need to double check the primary wiring, and do a power up and test. Then I will finish integrating the factory bike wiring to the controls and such. I will also be adding some HDPE sheet between all the batterys and mounting points as taught by "fire is BAD". Thanks for sharing that one!
I hope to power it up this weekend. I hope I can get the wiring correct, and the controller to respond properly. This is my greatest weakness. My confidence is low, as well as my skill level in this area.
Andrew, Frodus & JDH!!! Where are you all at now?????
Fill us in!!