Sturdly's blog

Chapter Three: Test fitting the motor mount

What's the brown leather belt for? Multiple choice test later in this entry.

Did my initial test fit of the motor mount and as expected the odd frame geometry is supplying more challenges.

A quick list of issues follows:

I. Down tube angle does not match angle of motor mount.

II. Supplied 2 inch round u clamp is not appropriate for this application.
A. Oval down tube is 2.25 x 1.25 inches = u bolt too short and too wide.
B. Round contact surfaces not a close enough match to distribute the clamping force allowing tube damage.

before comments

Chapter Two : Bottom bracket swap and chainline woes

Well, all the components and tools arrived from Harris yesterday. Order was complete including the grade 25 bearings. It came well packaged and everything was as advertised. I'll be ordering from them again if my LBS doesn't have what I need.

before comments

Chapter one: Starting down the ebike trail, decision and kit purchase

After much agonizing over which type of conversion kit to use I purchased an elation ebike bottom bracket drive kit from Oz which has finally arrived in the US after a bit of a wait. My main concern is no US distributor yet so it's all long distance so to speak.

I decided to go this route for multiple reasons. Local terrain includes many steep hills, the finished product needed to be light enough for me to lift into a transit bus bike carrier, I have no access to a machine shop and zero experience with electric bikes. This kit seemed to offer all that I was looking for. Mostly I wanted the bottom bracket mount Unite motor, motor freewheel adapter and the freewheeling crank set. I also liked the light weight, quick release, easy to carry, complete with handle battery pack.

before comments

Pages

Subscribe to RSS - Sturdly's blog


Who's online

There are currently 0 users online.

Who's new

  • Skyhawk 57
  • wild4
  • justinsmith07
  • Juli76
  • xovacharging

Support V is for Voltage