They are costly but in the long run it will be best since we are not using a BMS this will leave a very safe margin of AH'S on top and bottom and he can still travel more miles than the 60AH, cells.
Don't run these cells without BMS. You won't know if something goes wrong until it is too late.
Vectrix offers PCB adapters with fuse protection for their 2n generation BMS system. Despite these PCB were designed for their leaf boxs, they can match your configuration by mirroring one PCB. Installation is quite straight.
Don't run these cells without BMS. You won't know if something goes wrong until it is too late.
With bms can detect if a cell has less capacity. when a cell is empty it is for the bike stop.
With bms can stop driving or charging if the value is too high or low.
If a module is defective and has not bms can spoil the whole battery pack. With bms can detect and replace the defective module.
These are (2016-82 ah, cells from "HYBRIDAUTOCENTER.COM)
that price I pay for them?
including shipping and insurance.
So these are the new double cells from the 30kwh pack, equivalent (in voltage, not AH) to 18 of the 24kwh pack cells? Nice.
HI VINCENS, you will have to contact (HYBRIDAUTOCENTER.COM) for a quote on things not listed on the site.
340 USD per module+shipping+customs
Too expensive...
They are costly but in the long run it will be best since we are not using a BMS this will leave a very safe margin of AH'S on top and bottom and he can still travel more miles than the 60AH, cells.
Don't run these cells without BMS. You won't know if something goes wrong until it is too late.
Vectrix offers PCB adapters with fuse protection for their 2n generation BMS system. Despite these PCB were designed for their leaf boxs, they can match your configuration by mirroring one PCB. Installation is quite straight.
Thanks "R" for the info. that does look simple to set up.
I contacted with (HYBRIDAUTOCENTER.COM).
I was told that there is a problem with sending.
Batteries are considered hazardous materials.
The price of shipping is very expensive by plane.
The price does not include shipping price customs.
It is better to buy batteries near France.
With bms can detect if a cell has less capacity. when a cell is empty it is for the bike stop.
With bms can stop driving or charging if the value is too high or low.
If a module is defective and has not bms can spoil the whole battery pack. With bms can detect and replace the defective module.
Put a bms now will save money later.
I have one more photo before dissambly and painting.
HI fellows,I am still working my son's VX4-TRIKE.I have it stripped down so I can add a lot of led lights. I will post some new photos.