Vectrix 2007 VX-1 Replacing NiMh by Li Pack

5 posts / 0 new
Last post
François-Xavier Hay
Offline
Last seen: 11 years 10 months ago
Joined: Sunday, June 17, 2012 - 06:51
Points: 5
Vectrix 2007 VX-1 Replacing NiMh by Li Pack

Hi,
I am based in France and my vectrix (Nimh) does not work anymore: 2kms and then throttle doesnot give a push...I am told that the batteries are dead and need to be replaced with a recomendation to swap towards Li 42 a pack at 5500€...
Looking at the various discussion of this forum i would like to know if this ise possible for someone to replace the pack on his own or if you need to have some serious electricity competences?

Thanks in advance...

antiscab
Offline
Last seen: 10 months 4 weeks ago
Joined: Saturday, July 7, 2007 - 23:55
Points: 1686
Re: Vectrix 2007 VX-1 Replacing NiMh by Li Pack

Looking at the various discussion of this forum i would like to know if this ise possible for someone to replace the pack on his own or if you need to have some serious electricity competences?

If you are lucky, you only have a few dead cells

I would pull the battery out, and then dismantle

feel for any bulged cells

If you find less than 5, short them out with thick wire (25 mm^2 minimum)
after that, put the battery back together

remember to use a light bulb or similar to limit in rush current when re-connecting the Motor Controller

If you find more than 5, see if you can source some replacement cells.

Matt

Daily Ride:
2007 Vectrix, modified with 42 x Thundersky 60Ah in July 2010. Done 194'000km

toolboxjesse
Offline
Last seen: 7 years 2 months ago
Joined: Monday, February 13, 2012 - 12:52
Points: 56
Re: Vectrix 2007 VX-1 Replacing NiMh by Li Pack

@Antiscab, when you say short them out, do you mean connect the + and - terminals of the bad cell together, or do you mean remove the bad cell entirely from the circuit?

Thanks,
Jesse

Jesse in Atlanta

antiscab
Offline
Last seen: 10 months 4 weeks ago
Joined: Saturday, July 7, 2007 - 23:55
Points: 1686
Re: Vectrix 2007 VX-1 Replacing NiMh by Li Pack

@Antiscab, when you say short them out, do you mean connect the + and - terminals of the bad cell together, or do you mean remove the bad cell entirely from the circuit?

Either will work fine, although removing the cell entirely from the circuit works best from a resistance point of view

just make sure the wire you are using is 50 sq mm (multiple wires in parrallel is fine)

Matt

Daily Ride:
2007 Vectrix, modified with 42 x Thundersky 60Ah in July 2010. Done 194'000km

Galago
Offline
Last seen: 1 month 1 day ago
Joined: Saturday, October 11, 2008 - 09:00
Points: 122
Re: Vectrix 2007 VX-1 Replacing NiMh by Li Pack

I had 3 bad cells in the lower tier of my Nimhd pack.
Basically to paraphrase, 2-3km range and no acceleration to speak of...
I jumped out the three bad cells - see pic - with an aluminum strap...
IMG_0355.JPG
and now I have about 10-15miles of range. Not the best but I am
able to use the bike to commute 8 miles round trip. With the
runt battery I have put over 300 miles on the bike so far and
it seems to be holding fine - meaning my concerns for additional
bad cells have been mostly discounted by the performance.
With the 3 cells jumped out it is a MUST to watch the voltage
when charging and not let the battery overcharge.... (easily damaged).
In my case I never let the battery go above 142 volts.
regards.
mk

Log in or register to post comments

Use code"Solar22" and enjoy 12% off for all solar Kits.


Who's online

There are currently 0 users online.

Who's new

  • Bengun
  • Skyhawk 57
  • wild4
  • justinsmith07
  • Juli76

Support V is for Voltage