I was watching my Vectrix recharging this afternoon and noticed that when it was almost done the voltage was at 149V, but when the 60min. EC was complete, it was at 148V. I have also noticed that if I drain nearly all the power from the battery so that 1 bar is showing, the voltage is normally at 125V. How does this compare to other riders?
I have the Sept/Oct 2008 software on mine and almost always do a complete recharge until it switches off which takes between 4hrs. 30mins and 4hrs. 50min on a 240V outlet. This is running the battery down to between 2 and 4 bars and leaving it about 3hrs. before recharging. I also leave it fully charged for about 2.5hrs. before riding home.
I have the same software as you do and have aprox. the same voltages.
my low is 125V, normal high is 143V after euqlization 146V.